Walnut Creek Channel will be closed for dredging from 10PM Tuesday (10/1/02) till completion of work on Wednesday evening (10/2/02) The area to be affected will be at the basin exit to remove the existing gravel bar. The wall ends adjacent the basin exit will be roped off during work for angler safety. |
r3.thesafety.net (208.22.38.3)